Zero-person contractor

A civil contractor that runs itself.

SIC prices the tender, writes the job's documents and runs the project. People sign at the gates.

SIC Super Intelligence Civil
[] Sections
QLD Australia
Scroll
[ ]The companySIC

Deal with it like any contractor.

DWG Channels / SICScale NTS
AGENT TEAM CH.01CALL CH.02TEXT CH.03EMAIL CH.04CHATGPT RESPONDS
Email

Email the team

Write to the project manager, site engineer or estimator. The agent in that role replies.

Outbound

It writes to you

Notices, ITPs, quote requests and work packs, each from the role that owns it.

Agents

Agents do the work

Contract, method, quality, safety, price and programme. Every line is traced to a clause.

Gate

People sign

The owner signs the bid, the contract and the claims. Everything else runs on its own.

Run end to end on a real tender. The first live job is next.
[ ]ChatGPTSI Civil

Ask about the job in ChatGPT.

Add SI Civil, sign in, ask. Answers come from the project's own records, filtered to your role.

Answers quoted from the live SI Civil server, 2 October 2026, shown in ChatGPT.

[ ]PortalJervois Street

Every scope item, with its paperwork.

Pick a scope item. Its lots, tests and documents sit beside the 4D model and the programme.

01/ 03
  • Kerbs, one scope item.Its work elements, cost and lots, beside the 4D model and the programme.
  • The Gantt chart.Each task with its dates, resources, hold points, lots, materials and cost.
  • Cost over time.Cost by category and the planned claims, on the programme's time axis.
SIC Portal / Jervois StreetKerbs
The SIC portal Overview with the Kerbs scope item chosen on Friday 5 February 2027: the 4D model of the street and the programme on the left, the Summary tab on the right with the kerbs dates, status, estimate, lots, tests and work elements.
01Kerbs, one scope item. Its work elements, cost and lots, beside the 4D model and the programme.
The full Gantt chart in the SIC portal, grouped by scope item in each item's colour, with the Kerbs scope item open and a kerb pour task chosen: its dates, place, cost, a link into the 4D model, and its resources, hold points, lots and materials.
02The Gantt chart. Each task with its dates, resources, hold points, lots, materials and cost.
The Programme page with the cost overlay: the cost incurred over time split by category and stacked, with the claims, drawn over the bars on the same time axis with dollars on the right.
03Cost over time. Cost by category and the planned claims, on the programme's time axis.
[ ]What it handles Roles

The whole project team.

Tender

Pack readPricedBid

Cost control

BudgetForecastClaims

Procurement

Quotes asked forComparedOrdered

Communications

EmailsLettersCallsThe diary

Quality

LotsITPsTestsHold points

Safety

SWMSPermitsInductions

Accounts

InvoicesPaymentsXero

Portal

Scope itemsGanttIn 4D
[ ]Gates Signatures

SIC writes. People sign.

Gate 01

Owner

The bid, the contract and the claims.

Gate 02

Superintendent

Hold points, ITPs and certified claims.

Gate 03

Workers

Their SWMS, signed on their phone.

Gate 04

Suppliers and labs

Quotes, dockets and results, by email.

[ ]Film02:29

The whole job, in under three minutes.

SIC showcaseSilent / captioned
[ ]AboutContact

Built by Applied Ontologies. Led from Queensland by Tom Lynch, civil engineer.

Working with a few civil contractors as design partners.